Smith Flat Road Storm Drain & Paving Project
August 2025
Owner: City of Placerville
Contractor: Doug Veerkamp General Engineering
Products Used: Tensar InterAx NX750 Geogrid
R.E.Y. Engineers was contracted with the City of Placerville to design the structural pavement section for the Smith Flat Road reconstruction project. They were looking to provide a costefficient design to service this critical collector road.
The initial design required costly over-excavation to construct the planned pavement section. The engineer reached out to Tensar for help developing a cost-reducing alternate pavement section using InterAx geogrid. Tensar was able to recommend a structural section that would reduce over-excavation and aggregate base material by 50% while increasing the original design traffic index to provide a longer lasting pavement.