Shoreline Stabilization with Geosynthetic Foundations
The stabilization included the construction of five low-elevation, permeable rock groins and the placement of a large quantity of beach-compatible sand to restore the shoreline position and maintain a sandy beach. The design utilized Tensar Triton® Marine Mattresses and Tensar grid composite to serve as the foundation structure for the groins. Learn the unique advantages of constructing groins with Triton Marine Mattresses and how Longboat Key benefitted from this design.